Purified water · Homabay Town

Lori Purified Drops.
Pure water. Safe life.
Delivered to your door.

The Lori Purified Drops app is a mobile water-delivery app for Homabay Town. Order 5L, 10L and 20L bottles of purified drinking water from your phone, pay by M-PESA or cash on delivery, track your delivery live — and save when you refill.

Free to download · Refill any bottle and save 10% on your first order with code  REFILL10

Lori app home screen showing quick order sizes and current promotions
M-PESA & cash
Same-day delivery
Pay by M-PESA or cash on delivery
Same-day delivery in Homabay
Refill & save — water only
Sealed, UV-sterilised & quality-checked

About the app

What is the Lori Purified Drops app?

Lori Purified Drops is our Android app for ordering purified drinking water in Homabay Town, Kenya. It connects homes and offices directly to our water shop: browse bottle sizes and prices, choose a refill (exchange an empty bottle) or a brand-new reusable bottle, and place an order in under a minute.

With the app you can pay by M-PESA (a secure payment prompt appears on your phone at checkout) or cash on delivery, pin your delivery location on the map, pick a delivery time slot, and track your order live from “received” to “delivered”. The app also manages your order history, payment receipts, promo-code discounts and delivery notifications. Google sign-in is used solely to create your customer account quickly and securely.

How it works

Two taps to cold, clean water

1

Order in the app

Pick your size — 5L, 10L or 20L. Choose a refill (exchange your empty) or water with a brand-new reusable bottle, and set your delivery time.

2

Pay your way

Pay instantly with M-PESA — the prompt appears right on your phone — or simply pay cash when your rider arrives at the door.

3

Track to your door

Follow your order live in the app — received, preparing, dispatched, delivered — with a notification at every step of the way.

Sizes & pricing

Straight prices, no surprises

5L Compact

KES 70 / refill

  • Perfect for desks & small homes
  • New reusable bottle from KES 80
  • Free delivery
Order 5L

20L Standard

KES 200 / refill

  • Offices, events & big families
  • New reusable bottle available
  • Free delivery
Order 20L

Refill pricing applies when you exchange an empty Lori bottle. First order? Use code REFILL10 for 10% off.

Inside the app

Everything at your fingertips

Why Lori

Built for how Homabay drinks

Live order tracking

From "received" to "delivered" — watch your rider's progress on the map with a notification at every step.

M-PESA built in

Secure STK push payments right at checkout — or cash on delivery if you prefer. Receipts stored in the app.

Refill & save

Already have a Lori bottle? Exchange your empty and pay for water only — cheaper for you, kinder to the planet.

Smart notifications

Payment confirmations, dispatch alerts and exclusive promo codes — never miss a drop.

Choose your window

Pick a delivery time slot that fits your day — including same-day express when you're thirsty now.

Quality you can trust

Premium filtration, UV sterilisation and sealed bottles — every drop quality-checked before it leaves us.

Where we deliver

Homabay Town & surroundings

We deliver across Homabay Town and the surrounding neighbourhoods. Your rider brings the water to your door — you choose the spot on the map at checkout.

  • Homabay Town
  • Milimani
  • Makongeni
  • And nearby estates

Thirsty right now?

Order in under a minute and track it to your door.

Get the app

FAQ

Good questions, quick answers

How do I pay for my water?

Two ways: M-PESA (a payment prompt appears on your phone at checkout — just enter your PIN) or cash on delivery when the rider arrives.

What's the difference between a refill and a new bottle?

A refill means you hand back an empty Lori bottle and pay only for the water — that's the cheapest option. If you don't have a bottle yet, choose "water + new bottle" and a reusable one is added to your order.

How fast is delivery?

Most orders in Homabay Town arrive the same day. You can pick your preferred time slot at checkout, including express.

Do I need to create an account?

You can sign up with email or with your Google account in a few seconds. Your details stay private — see our privacy policy.

Is the water really purified?

Yes — every bottle goes through premium filtration and UV sterilisation, then is sealed and quality-checked before delivery.

Pure water is two taps away

Download the Lori Purified Drops app, order your first refill and get 10% off with code REFILL10.

Get it on Google Play